Flexible Tile Manufacturer Take You To Understand The Price
The price analysis of flexible tile by flexible tile manufacturer:
There are national standards for flexible tile. There are very few flexible tile products that can pass the national standard test, but qualified products are not too cheap. The price of $7 is a watershed in the quality of flexible tile, and products below $7 need to be carefully considered. Cheap products are either prone to chromatic aberration, or uneven thickness, or through technology, there will be anti-alkali; If there is a problem on site, not only the entire project will not make money, but even lose money.
Once, a construction party told me that he found a cheap and reliable manufacturer to cooperate with. He can get to the construction site for $4. As a result, the project is not yet complete. After a few rains, the color difference is reversed.
At present, the price of soft porcelain in the market is about $7-$35 per square meter, and also includes large-sized plates. Since the cost of large-sized plates will be relatively expensive, the price of large-sized plates is about $20-$65 per square meter.
We must always believe an old saying: good things are not cheap. NICOO will be your reliable and professional manufacturer, we can not only provide reliable price, but also reliable quality to each of our customers
How to Make Curved Cement Boards / Shaped Precast Wall Panels ?
In many decoration projects, we often see that there are some curved walls, columns, or corner positions that need to install plates, so we need some special curved or shaped plates to match. So how do we produce these curved slabs of cement?
Wide Application of Inorganic Terrazzo
The beauty of inorganic terrazzo floor is not only reflected in the ground.
How to Identify the Quality of Flexible Stone
China professional manufacturer NICOO teaches you to identify the quality of flexible stone.
60 Concrete Questions and Answers - Part 3
What do we need to know about concrete? About the concrete factories and the manufacturers, what we should do some preparation work?